Bid Date: 2026-03-02

Project Description: The project shall in general consist of but is not limited to removal of the existing gas water heater, hot water storage tanks, hot water return pump and piping and providing a new gas water heater, hot water storage tank, tempered water return pump and associated piping, insulation, structural modifications, roofing repairs, acoustical suspended ceilings, painting and electrical work as called for on the Plans and Technical Specifications.

Plans

05 - Plans.pdf

Specifications

01 - Bid Form.pdf
02 - Surety Bid Bond Form.pdf
03 - Requirements of Chapter 104, HRS Wages and Hours.pdf
04 - Technical Specifications.pdf
06 - Special Provisions.pdf
07 - General Provisions.pdf
08 - FCO-008 Insurance and Tax Rate Percentage Form.docx
09 - FCO Form 96 Change Order Proposal (COP) Form 10-12-23.xlsx
10 - FCO Form 96 Change Order Proposal Guidelines 10-12-23.pdf

Addendums/Amendments
Section 15950 HVAC TESTING ADJUSTING BALANCING.pdf

Section 15810 DUCTWORK AND DUCTWORK ACCESSORIES.pdf

Section 09310 - TILE AND STONE.pdf

Section 09250 - GYPSUM WALLBOARD.pdf

Revised Table of Contents.pdf

Revised Section 15080 MECHANICAL INSULATION.pdf

Revised Section 09900 - PAINTING.pdf

Revised Section 07560 - FLUID APPLIED ROOFING.pdf

Pre-bid meeting minutes and sign in sheet.pdf

B2026000028 Addendum No. 3.pdf

Addendum No. 3 Drawings.pdf

B2026000028 Addendum No. 2.pdf

B2026000028 Addendum No. 1.pdf