Bid Date: 2026-01-22

Project Description: This project includes roadway installation of temporary detour asphalt concrete paved road and temporary detour steel-truss bridge and abutments, temporary relocation of water main; demolition of bridge, abutments, columns, wing walls, and asphalt concrete pavement; and installation of replacement one-lane concrete bridge, abutments, columns, wing walls, concrete approach slab, asphalt concrete pavement, guardrails, pavement markings, signs, surface stabilization, permanent water main; and removal of temporary detour road, bridge, and water main, and restoration of disturbed areas.

Plans

Final Kahawaiokapia Construction Drawings.pdf

Specifications

Final Kahawaiokapia Special Provisions.pdf

Addendums/Amendments
Addendum 3 20260115.pdf

20251230 Addendum 2.pdf

POH-2025-00070_Enc. 3 (002).pdf

POH-2025-00070_Enc. 2 (002).pdf

POH-2025-00070_Enc. 1 (002).pdf

POH-2025-00070_20250812_Verification (002).pdf

USFWS Section 7 - 180530.pdf

US DOT Section 4(f) - 250317.pdf

SHPD Section 106 - 190125.pdf

NOAA Section 7 EFH consultation -171128.pdf

Final Cat Ex - 250725.pdf

FHWA Section 7 Endangered Species Act Consultation - 180618.pdf

CZM -250926.pdf

Archaeological Monitoring Plan - July 2021.pdf

12232025 Addendum 1.pdf