Bid Date: 2026-11-17
Project Description:
CPY 1 Width: 51’ 6” Height: 4’ 0” Projection: 13’ 6” approximate. Contractor is
responsible to measure and template the frame to ensure exact fit and accurate bid.
Fabric: Proof 502 70.87” or approved equivalent.
Special Instructions
* Contractor must be properly licensed with a State of Hawaii Specialty contractor license
* Contractors are to use OPM Form 54 to list any subcontractors to be used on this
project, if applicable. See
attachment
* Contractor must comply with the attached General Provisions for Construction Request for
Quotations (RFQ)(Small Purchases). See attachment.
*Contractor must be fully insured/bonded according to University of Hawaii requirements.
See the attached insurance requirements and bonding requirements in the general
provisions.
*Contractor must comply with prevailing wages according to University of Hawaii
requirements. See attachment.
* Hawaii Compliance Express clearance is required prior to Award and final payment.
* Vendor should not solely rely on provided plans or stated dimensions. Contractor is
responsible to measure and template the frame to ensure exact fit and accurate bid.
* The front curved edges, called catenaries, and the grommet areas will be sewn using UV-
inert thread.
* Warranty on this thread matches whatever warranty fabric it is sewn into.
* Request for a site visit upon arrival of materials on island for the canopy to establish
a reliable fabrication window, installation date and to coordinate removal of the existing
fabric and a time frame to complete the rust remediation and painting of existing frame
around that schedule.
Specifications:
* design, manufacture, and installation of one (1) replacement canopy fabric cover for the
existing frame
* include all fabric, roping, stainless steel cabling, and hardware required for the
recover.
* main fabric deck shall be manufactured using welded seams (where the fabric meets on the
rafters)
* front catenaries shall be sewn using Tenara thread.
* Fabrication and installation shall be performed under the management of an
internationally recognized Master Fabric Craftsman (MFC).
Addendum
11/13/26
Closing date extended to Tuesday Nov 17, 2026:
Contractor is responsible to measure and template the frame to ensure exact fit and accurate bid.