Bid Date: 2026-11-10
Project Description:
1 LIBRARY BUILDING MAILROOM SPLIT
Replace the failed Daikin Polara 2.5-ton Wall Mounted system (or approved equivalent)
due to a locked-rotor and obsolescence compressor. The replacement shall also include
refrigerant line set, line set cover, control wiring, and condensate drain line. Upon
completion of the installation, the Contractor shall test the system and verify
proper operation, with all work areas cleaned and restored to a safe condition.
If submitting a quote for a product substitute, advance approval is required. The
University may, at its discretion, reject or deny any product offer that it deems
to not be equal, and the findings in this regard shall be final and binding.
1 PAINA BUILDING IH3 CIRCUIT BOARD REPLACEMENT
Replace the faulty Melink base circuit board part #204-3012 (or approved
equivalent) in the Paina Class Act Intelli-Hood 3 system (“I” Tree). Upon
completion of the replacement, the Contractor shall test the system and
verify proper operation, with all work areas cleaned and restored to a safe
condition.
If submitting a quote for a product substitute, advance approval is required. The
University may, at its discretion, reject or deny any product offer that it deems
to not be equal, and the findings in this regard shall be final and binding.
4 CTAHR BUILDING 2 TXV AND 4 FILTER DRIER REPLACEMENT
Service two (2) separate HVAC refrigerant circuits by recovering the existing
refrigerant, replacing two (2) Sporlan thermostatic expansion valves (TXVs)
part #KT-83-VCP100 (or approved equivalent) and four (4) Sporlan Catch-All Liquid
filter driers part #C-164-S (or approved equivalent), and pulling a vacuum on
both circuits. Upon completion, the Contractor shall recharge the systems with
refrigerant and verify proper operation, with all work areas cleaned and restored
to a safe condition.
If submitting a quote for a product substitute, advance approval is required. The
University may, at its discretion, reject or deny any product offer that it deems
to not be equal, and the findings in this regard shall be final and binding.
1 KA LAMA BUILDING AHU 19 CHILL WATER COIL REPLACEMENT
Replace the Enviro-Tec chilled water coil part #36-20391-01 (or approved
equivalent) in Air Handling Unit (AHU) 19 serving Kalama Room 201 due to a
restriction affecting proper operation. Upon completion of the replacement,
the Contractor shall test the system and verify proper operation, with all
work areas cleaned and restored to a safe condition.
If submitting a quote for a product substitute, advance approval is required. The
University may, at its discretion, reject or deny any product offer that it deems
to not be equal, and the findings in this regard shall be final and binding.
1 PILINA BUILDING TELECOM ROOM 3 WAY VALVE LEAK REPAIR
Replace the existing Johnson Controls 1-inch three-way NPT Ball valve
part #VG1845CN (or approved equivalent) and Electric Spring Return Damper
Actuator part #M9208-BGA-3 (or approved equivalent) using ProPress fittings
to ensure secure connections. Upon completion of the replacement, the Contractor
shall bleed the line, reinsulate the piping, and verify proper operation, with
all work areas cleaned and restored to a safe condition.
If submitting a quote for a product substitute, advance approval is required. The
University may, at its discretion, reject or deny any product offer that it deems
to not be equal, and the findings in this regard shall be final and binding.
4 PAINA WIRELESS STATS
Replacement of four Johnson Controls wireless stats Part# WRZ-THJ0000-2 (or approved
equivalent) for Paina Building.
If submitting a quote for a product substitute, advance approval is required. The
University may, at its discretion, reject or deny any product offer that it deems
to not be equal, and the findings in this regard shall be final and binding.
1 HEADSTART BUILDING VALVE BODY EEV ASSEMBLY REPLACEMENT
Replace the existing electronic expansion valve (EEV) valve body assembly part
#4027054 (or approved equivalent). The Contractor shall recover the refrigerant,
braze the replacement valve body into place, perform a leak check, and recharge the
system with refrigerant as needed. Upon completion, the Contractor shall turn on the
unit, test the system, and verify proper operation, with all work areas cleaned and
restored to a safe condition.
If submitting a quote for a product substitute, advance approval is required. The
University may, at its discretion, reject or deny any product offer that it deems
to not be equal, and the findings in this regard shall be final and binding.
1 IKE LEA BUILDING ELECTRICAL ROOM 144 UNIT REPLACEMENT
Replace both the indoor and outdoor units of the existing Daikin OTERRA 1.0-Ton
Wall Mount Cooling System (or approved equivalent) located in the Room 144
Electrical Room. Upon completion of the installation, the Contractor shall test
the system and verify proper operation, with all work areas cleaned and restored
to a safe condition.
If submitting a quote for a product substitute, advance approval is required. The
University may, at its discretion, reject or deny any product offer that it deems
to not be equal, and the findings in this regard shall be final and binding.
2 KAAIKE BUILDING CONTROLS ACTUATORS REPLACEMENT
Remove and replace the faulty actuators for Air Handling Units (AHUs) 2D and 2G in
the Kaaike Building with new Johnson Controls actuators Part# M9203-GGA-2 (or
approved equivalent. Upon completion of the replacements, the Contractor shall test
the actuators and verify proper operation of both HVAC systems, with all work areas
cleaned and restored to a safe condition.
If submitting a quote for a product substitute, advance approval is required. The
University may, at its discretion, reject or deny any product offer that it deems
to not be equal, and the findings in this regard shall be final and binding.
1 IMPORTANT NOTES:
• Work may involve temporary shutdown of AC.
• All work to be done during normal campus hours: Monday - Friday
from 7:00 a.m. - 3:30 p.m. Hawaii Standard Time (HST).
• Must be completed, tested, and certified operational within ninety (90) consecutive
calendar days from the date designated in the approved Purchase Order.
• Vendor must properly dispose of project waste off UHMC campus property.
Special Instructions
1. QUOTE VALID FOR: Minimum of sixty (60) consecutive calendar days after the Request
for Quotation closing date. PLEASE REMEMBER TO UPDATE YOUR BID DOCUMENT
TO REFLECT sixty (60) DAYS.
2. All vendors are advised to review the Special Instructions and all attachments to
this Request for Quotation. Submission of a quote confirms that the vendor has carefully
examined these documents, and agrees to the University of Hawaii Terms
& Conditions applicable to all Purchase Orders.
ATTACHMENTS:
(1) Technical Specifications
(2) Requirements for Chapter 104 HRS (Wages and Hours) *PREVAILING WAGE MUST BE
PAID WHILE ON THIS PROJECT.*
(3) Special Provisions
(4) University of Hawaii Terms & Conditions Applicable to all Purchase Orders
(5) University of Hawaii General Provisions for Construction Request for Quotations
(6) Attachment C Bid Bonds/Performance Bonds
(7) Listing of Joint Contractor and/or Subcontractors
(8) Certification of Compliance with HRS 396-18, Safety and Health Programs
(9) Itemized Quote (Sample)
3. BASIS FOR AWARD: Award will be based on the total aggregate amount. Award is
subject to availability of funds.
4. REQUIRED DOCUMENTATION FOR AWARD: Vendor receiving the award is required to
provide the following documentation before purchase order is issued:
(1) Hawaii Compliance Express Certificate of Vendor Compliance
(2) Certification of Insurance (refer to Special Provisions Attachment 2)
(3) Contractor Licenses Required: C52
(4) Itemization of quote: upon request
(5) Attachment C Bid Bonds/Performance Bonds (as applicable)
(6) Listing of Joint Contractor and/or Subcontractors
(7) Certification of Compliance with HRS 396-18, Safety and Health Programs (as
applicable)
(8) Signed Super Quote Award notice
5. QUESTIONS & REQUESTS FOR SUBSTITUTION: shall be submitted via email to Herman
Andaya, email handaya@hawaii.edu no later than 12:00 p.m. Hawaii Standard Time (HST),
November 5, 2026.
6. SITE VISIT HIGHLY RECOMMENDED: A site visit will be held on November 4, 2026.
Please meet Herman Andaya at the Operations & Maintenance Building at 9:00 a.m. The
purpose of the initial inspection is to allow contractors to examine existing site
conditions and understand the nature and extend of the work that is required. No
additional allowance will be granted because of lack of knowledge of such conditions.
7. Project shall be completed within ninety (90) consecutive calendar days from the date
designated in the approved Purchase Order.
8. Inclusion of terms and conditions may be grounds for disqualification.
9. WARRANTY: The material furnished shall be new in accordance with the technical
specifications. Used or refurbished goods will not be accepted. Contractor shall
warrant that all goods furnished under this contract shall be guaranteed for the
Manufacturer\'s Standard Warranty from the date of installation. Contractor shall
replace and/or repair any defective goods at no cost to the University during the
warranty period, provided such defects are not due to abuse or negligence on the
part of the University.
10. Quote shall include all labor, materials, tools, equipment, shipping and handling,
transportation, freight, travel expenses and applicable taxes and fees necessary to
complete the project in accordance with the project description and attached documents.