Bid Date: 2026-11-10

Project Description:
1 LIBRARY BUILDING MAILROOM SPLIT
Replace the failed Daikin Polara 2.5-ton Wall Mounted system (or approved equivalent) due to a locked-rotor and obsolescence compressor. The replacement shall also include refrigerant line set, line set cover, control wiring, and condensate drain line. Upon completion of the installation, the Contractor shall test the system and verify proper operation, with all work areas cleaned and restored to a safe condition.

If submitting a quote for a product substitute, advance approval is required. The University may, at its discretion, reject or deny any product offer that it deems to not be equal, and the findings in this regard shall be final and binding.

1 PAINA BUILDING IH3 CIRCUIT BOARD REPLACEMENT
Replace the faulty Melink base circuit board part #204-3012 (or approved equivalent) in the Paina Class Act Intelli-Hood 3 system (“I” Tree). Upon completion of the replacement, the Contractor shall test the system and verify proper operation, with all work areas cleaned and restored to a safe condition.

If submitting a quote for a product substitute, advance approval is required. The University may, at its discretion, reject or deny any product offer that it deems to not be equal, and the findings in this regard shall be final and binding.

4 CTAHR BUILDING 2 TXV AND 4 FILTER DRIER REPLACEMENT
Service two (2) separate HVAC refrigerant circuits by recovering the existing refrigerant, replacing two (2) Sporlan thermostatic expansion valves (TXVs) part #KT-83-VCP100 (or approved equivalent) and four (4) Sporlan Catch-All Liquid filter driers part #C-164-S (or approved equivalent), and pulling a vacuum on both circuits. Upon completion, the Contractor shall recharge the systems with refrigerant and verify proper operation, with all work areas cleaned and restored to a safe condition.

If submitting a quote for a product substitute, advance approval is required. The University may, at its discretion, reject or deny any product offer that it deems to not be equal, and the findings in this regard shall be final and binding.

1 KA LAMA BUILDING AHU 19 CHILL WATER COIL REPLACEMENT
Replace the Enviro-Tec chilled water coil part #36-20391-01 (or approved equivalent) in Air Handling Unit (AHU) 19 serving Kalama Room 201 due to a restriction affecting proper operation. Upon completion of the replacement, the Contractor shall test the system and verify proper operation, with all work areas cleaned and restored to a safe condition.

If submitting a quote for a product substitute, advance approval is required. The University may, at its discretion, reject or deny any product offer that it deems to not be equal, and the findings in this regard shall be final and binding.

1 PILINA BUILDING TELECOM ROOM 3 WAY VALVE LEAK REPAIR
Replace the existing Johnson Controls 1-inch three-way NPT Ball valve part #VG1845CN (or approved equivalent) and Electric Spring Return Damper Actuator part #M9208-BGA-3 (or approved equivalent) using ProPress fittings to ensure secure connections. Upon completion of the replacement, the Contractor shall bleed the line, reinsulate the piping, and verify proper operation, with all work areas cleaned and restored to a safe condition.

If submitting a quote for a product substitute, advance approval is required. The University may, at its discretion, reject or deny any product offer that it deems to not be equal, and the findings in this regard shall be final and binding.

4 PAINA WIRELESS STATS
Replacement of four Johnson Controls wireless stats Part# WRZ-THJ0000-2 (or approved equivalent) for Paina Building.

If submitting a quote for a product substitute, advance approval is required. The University may, at its discretion, reject or deny any product offer that it deems to not be equal, and the findings in this regard shall be final and binding.

1 HEADSTART BUILDING VALVE BODY EEV ASSEMBLY REPLACEMENT
Replace the existing electronic expansion valve (EEV) valve body assembly part #4027054 (or approved equivalent). The Contractor shall recover the refrigerant, braze the replacement valve body into place, perform a leak check, and recharge the system with refrigerant as needed. Upon completion, the Contractor shall turn on the unit, test the system, and verify proper operation, with all work areas cleaned and restored to a safe condition.

If submitting a quote for a product substitute, advance approval is required. The University may, at its discretion, reject or deny any product offer that it deems to not be equal, and the findings in this regard shall be final and binding.

1 IKE LEA BUILDING ELECTRICAL ROOM 144 UNIT REPLACEMENT
Replace both the indoor and outdoor units of the existing Daikin OTERRA 1.0-Ton Wall Mount Cooling System (or approved equivalent) located in the Room 144 Electrical Room. Upon completion of the installation, the Contractor shall test the system and verify proper operation, with all work areas cleaned and restored to a safe condition.

If submitting a quote for a product substitute, advance approval is required. The University may, at its discretion, reject or deny any product offer that it deems to not be equal, and the findings in this regard shall be final and binding.

2 KAAIKE BUILDING CONTROLS ACTUATORS REPLACEMENT
Remove and replace the faulty actuators for Air Handling Units (AHUs) 2D and 2G in the Kaaike Building with new Johnson Controls actuators Part# M9203-GGA-2 (or approved equivalent. Upon completion of the replacements, the Contractor shall test the actuators and verify proper operation of both HVAC systems, with all work areas cleaned and restored to a safe condition.

If submitting a quote for a product substitute, advance approval is required. The University may, at its discretion, reject or deny any product offer that it deems to not be equal, and the findings in this regard shall be final and binding.

1 IMPORTANT NOTES:
• Work may involve temporary shutdown of AC.
• All work to be done during normal campus hours: Monday - Friday from 7:00 a.m. - 3:30 p.m. Hawaii Standard Time (HST).
• Must be completed, tested, and certified operational within ninety (90) consecutive calendar days from the date designated in the approved Purchase Order.
• Vendor must properly dispose of project waste off UHMC campus property.

Special Instructions
1. QUOTE VALID FOR: Minimum of sixty (60) consecutive calendar days after the Request for Quotation closing date. PLEASE REMEMBER TO UPDATE YOUR BID DOCUMENT TO REFLECT sixty (60) DAYS.

2. All vendors are advised to review the Special Instructions and all attachments to this Request for Quotation. Submission of a quote confirms that the vendor has carefully examined these documents, and agrees to the University of Hawaii Terms & Conditions applicable to all Purchase Orders.

ATTACHMENTS:
(1) Technical Specifications
(2) Requirements for Chapter 104 HRS (Wages and Hours) *PREVAILING WAGE MUST BE PAID WHILE ON THIS PROJECT.*
(3) Special Provisions
(4) University of Hawaii Terms & Conditions Applicable to all Purchase Orders
(5) University of Hawaii General Provisions for Construction Request for Quotations
(6) Attachment C Bid Bonds/Performance Bonds
(7) Listing of Joint Contractor and/or Subcontractors
(8) Certification of Compliance with HRS 396-18, Safety and Health Programs
(9) Itemized Quote (Sample)

3. BASIS FOR AWARD: Award will be based on the total aggregate amount. Award is subject to availability of funds.

4. REQUIRED DOCUMENTATION FOR AWARD: Vendor receiving the award is required to provide the following documentation before purchase order is issued:

(1) Hawaii Compliance Express Certificate of Vendor Compliance
(2) Certification of Insurance (refer to Special Provisions Attachment 2)
(3) Contractor Licenses Required: C52
(4) Itemization of quote: upon request
(5) Attachment C Bid Bonds/Performance Bonds (as applicable)
(6) Listing of Joint Contractor and/or Subcontractors
(7) Certification of Compliance with HRS 396-18, Safety and Health Programs (as applicable)
(8) Signed Super Quote Award notice

5. QUESTIONS & REQUESTS FOR SUBSTITUTION: shall be submitted via email to Herman Andaya, email handaya@hawaii.edu no later than 12:00 p.m. Hawaii Standard Time (HST), November 5, 2026.

6. SITE VISIT HIGHLY RECOMMENDED: A site visit will be held on November 4, 2026. Please meet Herman Andaya at the Operations & Maintenance Building at 9:00 a.m. The purpose of the initial inspection is to allow contractors to examine existing site conditions and understand the nature and extend of the work that is required. No additional allowance will be granted because of lack of knowledge of such conditions.

7. Project shall be completed within ninety (90) consecutive calendar days from the date designated in the approved Purchase Order.

8. Inclusion of terms and conditions may be grounds for disqualification.

9. WARRANTY: The material furnished shall be new in accordance with the technical specifications. Used or refurbished goods will not be accepted. Contractor shall warrant that all goods furnished under this contract shall be guaranteed for the Manufacturer\'s Standard Warranty from the date of installation. Contractor shall replace and/or repair any defective goods at no cost to the University during the warranty period, provided such defects are not due to abuse or negligence on the part of the University.

10. Quote shall include all labor, materials, tools, equipment, shipping and handling, transportation, freight, travel expenses and applicable taxes and fees necessary to complete the project in accordance with the project description and attached documents.

Plans

Specifications

(1) Tech Specs - Various Campuswide HVAC Repairs SQ120610.pdf
eH104-3-rev-04-21.pdf
SQ#120610 Special Provisions w_Warranty.pdf
PO-Terms-Conditions-1-Pager_12-17-25.pdf
GenProv Construction-RFQ (EFF. 09-13).pdf
Attachment C - Bonds.pdf
OPM-Form-54.pdf
CERT of COMPLIANCE HRS 396-18, SAFETY AND HEALTH PROGRAMS.pdf
UHMC Itemization Sample Construction Rev. 08.28.26.pdf