Bid Date: 2026-10-23
Project Description:
Provide all labor necessary to repair the chiller leaks as indicated in the plans and
specifications. The proposed work shall generally include removal, disposal and
replacement of the chiller O-ring /gaskets hat is leaking per manufacturer’s
specifications; any insulation that is removed must be replaced with new. Start-up
the chiller per manufacturer’s recommendations and perform system checks to confirm
proper operations. Submit all data collected to the university of Hawaii facilities
management office, attention: Carl Oshiro prior to request for final inspection. All
work located in the mechanical room at Information Technology Center, UHM.
Provide all tools, materials, equipment and insurance necessary to repair the chiller
leaks as indicated in the plans and specifications. The proposed work shall generally
include removal, disposal and replacement of the chiller O-ring /gaskets hat is
leaking per manufacturer’s specifications; any insulation that is removed must be
replaced with new. Start-up the chiller per manufacturer’s recommendations and
perform system checks to confirm proper operations. Submit all data collected to the
university of Hawaii facilities management office, attention: Carl Oshiro prior to
request for final inspection. All work located in the mechanical room at Information
Technology Center, UHM.
Special Instructions
ALL bidders are requested to attend a mandatory site walk-through. A site walk through is
scheduled for 8:00am on Tuesday October 13, 2026. Contractors shall meet at the
Physical Plant Mechanical Engineer Office located at 2002 East- West Road. Contract
documents will be distributed at the mandatory walk through. Contractors interested in
bidding this work must contact Carl Oshiro through email ( coshiro6@hawaii.edu), facsimile
(956-5979) or phone (956-0479) to confirm attendance by 4:00 p.m. Monday October 12,
2026. Contractors who DO NOT attend a mandatory site walk-through will not be allowed to
bid on this work. Contractor is required to provide a cost breakdown at time of bid. The
breakdown must equal to the total cost of the bid. If correct breakdown is not provided at
time of bid, the bid may be disqualified.
Addendum
10/19/26
apply bly-gold to the air cool condenser coil
No attachments have been added to this solicitation.