Bid Date: 2026-10-22

Project Description: The project involves replacing an existing roadside dry-stacked rock retaining wall with a concrete soil nail wall; replacing metal guardrail; paving roadway shoulders and underneath guardrails; cold planing and resurfacing of existing travelway; installing and replacing signage and pavement markings; installing vinyl picket fencing, grading for the soil nail wall; demolition of trees; relocation of trees; temporary relocation of overhead electrical lines; installation of a temporary utility pole; installing and replacing water service lateral and appurtenances; and installing temporary BMPs and erosion control measures.

Plans

23-08 130 IAO VALLEY RD GDRL AND WALL REPL -FINAL PLANS 9.2.26.pdf

Specifications

23-08 SPECS - Final - 2026-09-18.pdf

Addendums/Amendments
Addendum No. 1 - 23-08 w attach.pdf