Bid Date: 2026-09-15
Project Description:
PILINA BUILDING PIPE INSULATION
The Contractor shall furnish and install new insulation on the existing piping above
Pilina Building Room 121 and the 1st Floor Electrical Room to prevent condensation
and water dripping onto the ceiling tiles below. The Contractor shall remove and
properly dispose of any deteriorated or damaged existing insulation, prepare the
piping as necessary, and install new insulation in accordance with applicable
manufacturer specifications and industry standards to provide a complete and properly
sealed installation. Price shall include all labor, supervision, materials,
insulation, equipment, tools, removal and disposal of existing insulation,
transportation, travel expenses, cleanup, and all applicable taxes and fees necessary
to complete the project.
IMPORTANT NOTES:
• Work may involve temporary shutdown of Pilina Building AC.
• All work to be done during normal campus hours: Monday - Friday
from 7:00 a.m. - 3:30 p.m. Hawaii Standard Time (HST).
• Must be completed, tested, and certified operational within 90 consecutive
calendar days from the date designated in the approved Purchase Order.
• Vendor must properly dispose of project waste off UHMC campus property.
Special Instructions
1. All vendors are advised to review the Special Instructions and all attachments to
this Request for Quotation. Submission of a quote confirms that the vendor has carefully
examined these documents, and agrees to the University of Hawaii Terms & Conditions
applicable to all Purchase Orders.
ATTACHMENTS:
(1) Technical Specifications
(2) Requirements for Chapter 104 HRS (Wages and Hours) *PREVAILING WAGE MUST BE
PAID WHILE ON THIS PROJECT.*
(3) Special Provisions
(4) University of Hawaii Terms & Conditions Applicable to all Purchase Orders
(5) University of Hawaii General Provisions for Construction Request for Quotations
(6) Attachment C Bid Bonds/Performance Bonds
(7) Listing of Joint Contractor and/or Subcontractors
(8) Certification of Compliance with HRS 396-18, Safety and Health Programs
(9) Itemized Quote (Sample)
2. QUOTE VALID FOR: Minimum of sixty (60) consecutive calendar days after the Request
for Quotation closing date.
3. BASIS FOR AWARD: Award will be based on the total aggregate amount. Award is
subject to availability of funds.
4. REQUIRED DOCUMENTATION FOR AWARD: Vendor receiving the award is required to
provide the following documentation before purchase order is issued:
(1) Hawaii Compliance Express Certificate of Vendor Compliance
(2) Certification of Insurance (refer to Special Provisions Attachment 2)
(3) Contractor Licenses Required: C2
(4) Itemization of quote: upon request
(5) Attachment C Bid Bonds/Performance Bonds (as applicable)
(6) Listing of Joint Contractor and/or Subcontractors
(7) Certification of Compliance with HRS 396-18, Safety and Health Programs (as
applicable)
(8) Signed Super Quote Award notice
5. QUESTIONS & REQUESTS FOR SUBSTITUTION: shall be submitted via email to Herman
Andaya, email handaya@hawaii.edu no later than 12:00 p.m. Hawaii Standard Time (HST),
September 11, 2026.
6. SITE VISIT HIGHLY RECOMMENDED: A site visit will be held on September 10, 2026.
Please meet Herman Andaya at the Operations & Maintenance Building at 9:00 a.m. The
initial inspection is to identify and examine the conditions and to be aware or
satisfied as to the character and amount of work to be performed as called for by
the specifications. No additional allowance will be granted because of lack of knowledge
of such conditions.
7. Project shall be completed within 90 consecutive calendar days from the date
designated in the approved Purchase Order.
8. Inclusion of terms and conditions may be grounds for disqualification.
9. WARRANTY: The material furnished shall be new in accordance with the technical
specifications. Used or refurbished goods will not be accepted. Contractor shall
warrant that all goods furnished under this contract shall be guaranteed for the
Manufacturer’s Standard Warranty from the date of installation. Contractor shall
replace and/or repair any defective goods at no cost to the University during the
warranty period, provided such defects are not due to abuse or negligence on the
part of the University.
10. Quote shall include all labor, materials, tools, equipment, shipping and handling,
transportation, freight, travel expenses and applicable taxes and fees necessary to
complete the project in accordance with the project description and attached documents.