Bid Date: 2026-10-14

Project Description: The project involves the relining of existing two 42-inch culverts located along Wailea Alanui Drive with the sliplining process using high-density polyethylene (HDPE) pipe and new hydrobell inlet connection. Existing headwall at the 2-42 inch culverts and an existing catch basin will be removed and replaced along with CRM apron. Additionally, the relining of an existing 78" culvert along Makena Alanui, with the sliplining process using High Density Profile Wall Polyethylene (HDPE) pipe.

Plans

25-47 Bid Set Construction Plan.pdf

Specifications

25-47 Bid Set Specifications.pdf

Addendums/Amendments