Bid Date: 2026-09-11

Project Description:
1 PAINA - RATIONAL IVARIO PRO XL 40-GAL ELECTRIC TILT SKILLET
• Provide electrical installation and required power connection for one (1)
Rational iVario Pro XL 40Gallon Electric Tilt Skillet.
• Install required branch circuit, wiring, conduit, disconnecting means, and associated electrical components as required.
• Make final electrical connections to the equipment and verify proper power supply.

1 PAINA - VOLLRATH CAYENNE CAST IRON, PANINI STYLE SANDWICH PRESS
• Provide and install a new dedicated electrical circuit for one (1) no. TSI8002-C Vollrath Cayenne Cast Iron, Panini Style Sandwich Press.
• Install required conduit, conductors, receptacle/outlet, circuit breaker, and associated electrical components.
• Test circuit for proper operation upon completion.

8 HEALTH CENTER - EXTERIOR LIGHTING
• Provide all necessary electrical work for the installation of eight (8) exterior light fixtures at the Health Center, including three (3) existing fixtures requiring troubleshooting and five (5) new light fixtures.
• Install required conduit, wiring, connections, and associated electrical components as required.
• Test installed lighting and verify proper operation.

8 LIBRARY BUILDING - GOLF CART CHARGERS
• Provide electrical power and associated circuit installation for eight (8) golf cart charging stations at the Library Building.
• Install required branch circuits, conduit, conductors, receptacles/outlets, circuit breakers, and associated electrical components.
• Test completed circuits for proper operation.

8 OM BUILDING - GOLF CART CHARGERS
• Provide electrical power and associated circuit installation for eight (8) drop down golf cart charging stations at the O&M Building.
• Install required branch circuits, conduit, conductors, receptacles/outlets, circuit breakers, and associated electrical components.
• Test completed circuits for proper operation.

IMPORTANT NOTES:
• Work may involve temporary localized shutdown of electrical service.
• All work to be done during normal campus hours: Monday - Friday from 7:00 a.m. - 3:30 p.m. Hawaii Standard Time (HST).
• Must be completed, tested, and certified operational within 90 consecutive calendar days from the date designated in the approved Purchase Order.
• Vendor must properly dispose of project waste off UHMC campus property.

Special Instructions
1. All vendors are advised to review the Special Instructions and all attachments to this Request for Quotation. Submission of a quote confirms that the vendor has carefully examined these documents, and agrees to the University of Hawaii Terms & Conditions applicable to all Purchase Orders.

ATTACHMENTS:
(1) Technical Specifications
(2) Requirements for Chapter 104 HRS (Wages and Hours) *PREVAILING WAGE MUST BE PAID WHILE ON THIS PROJECT.*
(3) Special Provisions
(4) University of Hawaii Terms & Conditions Applicable to all Purchase Orders
(5) University of Hawaii General Provisions for Construction Request for Quotations
(6) Attachment C Bid Bonds/Performance Bonds
(7) Listing of Joint Contractor and/or Subcontractors
(8) Certification of Compliance with HRS 396-18, Safety and Health Programs
(9) Itemized Quote (Sample)

2. QUOTE VALID FOR: Minimum of sixty (60) consecutive calendar days after the Request for Quotation closing date. Please update the quote validity date on your CommercePoint quote submission document.

3. BASIS FOR AWARD: Award will be based on the total aggregate amount. Award is subject to availability of funds.

4. REQUIRED DOCUMENTATION FOR AWARD: Vendor receiving the award is required to provide the following documentation before purchase order is issued:

(1) Hawaii Compliance Express Certificate of Vendor Compliance
(2) Certification of Insurance (refer to Special Provisions Attachment)
(3) Contractor Licenses Required: C13
(4) Itemization of quote: upon request
(5) Attachment C Bid Bonds/Performance Bonds (as applicable)
(6) Listing of Joint Contractor and/or Subcontractors
(7) Certification of Compliance with HRS 396-18, Safety and Health Programs (as applicable)
(8) Signed Super Quote Award notice

5. QUESTIONS & REQUESTS FOR SUBSTITUTION: shall be submitted via email to Herman Andaya, email handaya@hawaii.edu no later than 12:00 p.m. Hawaii Standard Time (HST), September 4, 2026.

6. SITE VISIT HIGHLY RECOMMENDED: A site visit will be held on September 2, 2026. Please meet Herman Andaya at the Operations & Maintenance Building at 9:00 a.m. The initial inspection is to identify and examine the conditions and to be aware or satisfied as to the character and amount of work to be performed as called for by the specifications. No additional allowance will be granted because of lack of knowledge of such conditions.

7. Project shall be completed within 90 consecutive calendar days from the date designated in the approved Purchase Order.

8. Inclusion of terms and conditions may be grounds for disqualification.

9. WARRANTY: The material furnished shall be new in accordance with the technical specifications. Used or refurbished goods will not be accepted. Contractor shall warrant that all goods furnished under this contract shall be guaranteed for the Manufacturer\\\'s Standard Warranty from the date of installation. Contractor shall replace and/or repair any defective goods at no cost to the University during the warranty period, provided such defects are not due to abuse or negligence on the part of the University.

10. Quote shall include all labor, materials, tools, equipment, shipping and handling, transportation, freight, travel expenses and applicable taxes and fees necessary to complete the project in accordance with the project description and attached documents.

Plans

Specifications

(1) Tech Specs - UH Maui College Paina, Health Center, Library, and OM Building Electrical Projects SQ116817.pdf
eH104-3-rev-04-21.pdf
SQ#116817 Special Provisions w_Warranty.pdf
PO-Terms-Conditions-1-Pager_12-17-25.pdf
GenProv Construction-RFQ (EFF. 09-13).pdf
Attachment C - Bonds.pdf
OPM-Form-54.pdf
CERT of COMPLIANCE HRS 396-18, SAFETY AND HEALTH PROGRAMS.pdf
UHMC Itemization Sample Construction Rev. 08.28.26.pdf

Addendums/Amendments