Bid Date: 2026-09-21
Project Description: Project installs a new raised concrete pad and supporting infrastructure on the airfield at Marine Corps Base Hawaii (MCBH) Kaneohe Bay to support the Navy’s new Commercial Off-The-Shelf (COTS) PAR (Precision Approach Radar) equipment and shelter. Scope of work for this project includes site preparation required for a new concrete pad, construction of a new concrete pad approximately 40 feet by 20 feet near the existing PAR off of Taxiway Alpha, installation of site electrical to support the PAR, installation of back-up generator as required, installation of communication infrastructure to include underground fiber optic lines and conduits required to support Single Mode fiber optics, and installation of a grounding system for lightning protection/obstruction. See MCAS Kaneohe Bay Site Survey Report dated 08 November 2021 for more detailed project requirements. The AN/FPN- 68A location requires a raised concrete pad at a minimum of 3.3 ft (1 meter) high for both the radar sensor and electronics equipment shelter with a concrete ramp one side. Additionally, the AN-FPN-68A requires Single Mode fiber optic cable.
Project duration is 390 days total, including design time. The project is Prevailing Wage and has the Buy American requirement.
Trades required, but not limited to are: Construction Office Trailer, Portable Restrooms, Temporary Fencing, Temporary Erosion Control, Material Testing, Special Inspections, Utility Locating, Construction Staking, Archeologists, Commissioning, Geotechnical Monitoring, Demolition, Cast-in-Place Concrete, Electrical, Electrical Testing, Lightning Protection, Telecom (OSP), Earthwork and Dewatering.
BID DATE: 09/21/2026 07:00 AM Hawaiian
QUESTIONS DUE: 09/09/2026 7:00 AM HST
PRE BID: 09/03/2026 6:00 AM HST
At Project Location. (Park at Air Terminal)
Construction Type: Tenant Improvements (Design/Build)
Construction Value: $1,000,000 - $5,000,000
Submit questions to David Shiel at estimating@authumki.com