Bid Date: 2026-10-08
Project Description: The project involves the repair of two corrugated metal pipe culvert systems along Makena Alanui Drive. The scope of work includes replacement of two 10 feet diameter corrugated metal pipes with reinforced concrete box culverts, limited excavation for the installation of reinforced concrete box culverts, and the slip-lining of three 66-inch diameter corrugated metal pipes with 54 inch diameter high-density polyethylene (HDPE) pipes. The scope of work also includes pavement restoration, adjustment of manholes, and other incidental items.