Bid Date: 2026-09-18

Project Description: The work consists of furnishing and paying for all labor, tools, equipment, and materials necessary for the advancement of a soil boring (location shown on the attached Site Plan), collection of soil and rock samples, conversion of the soil boring into a monitoring well, development of the monitoring well, installation of a dedicated groundwater sampling pump system, inclusive of all appurtenances in accordance with the plans and specifications.

Plans

JOB 26-001A PLANS.pdf

Specifications

JOB 26-001A BID SUPPORTING DOCUMENTS.pdf
JOB 26-001A SPECIFICATIONS.pdf
Digital and Electronic Signature Info 4-14-22.pdf
JOB 26-001A PREBID CONFERENCE LOCATION MAP.pdf
JOB 26-001A BID PROPOSAL EXCEL FILE.xlsx

Addendums/Amendments
JOB 26-001A ADDENDUM NO. 1.pdf