Bid Date: 2026-07-17
Project Description:
MAIN VALVES
To furnish and install two (2) new 6-inch gate valves and one (1) new
8-inch gate valve, including all associated materials, equipment, labor,
excavation, restoration, and testing necessary to provide a fully
operational water distribution system. The Contractor shall excavate
and remove existing asphalt as required to expose the existing water
mains and valves at an approximate depth of four (4) feet. Existing
valves shall be removed and replaced with new gate valves of the specified
size. New valve box risers shall be installed, trenches shall be backfilled,
and all disturbed asphalt surfaces shall be restored to their original
condition.
The 8-inch gate valve replacement is located at the Kaahumanu Avenue side entry and
will require temporary closure of the entry during construction. The main water
supply serving the campus shall be shut down for approximately eight (8) hours to
facilitate removal of the existing valve and installation of the new valve.
One (1) 6-inch gate valve replacement is located along Kaahumanu Avenue
Driveway entering the Noi\\\'i parking area and will require a temporary partial
closure of the drive lane during construction. The second 6-inch gate
valve replacement is located adjacent to the ADA parking area, requiring the
temporary closure of two (2) parking stalls during the duration of the work.
Water service interruptions associated with these valve replacements shall be
coordinated to minimize impacts to campus operations.
During construction, the Contractor shall provide appropriate traffic control
measures, install metal trench plates where required to maintain safe pedestrian
and vehicle access, and ensure all work areas are properly secured until
permanent restoration is complete. Upon completion of the valve installations, the
Contractor shall patch and restore all three excavation areas with new asphalt.
Price shall include all labor, supervision, materials, gate valves, valve box
risers, excavation, trenching, removal and disposal of existing valves and debris,
backfill, asphalt restoration, traffic control, equipment, tools, transportation,
shipping and handling, travel expenses, testing, cleanup, and all applicable taxes
and fees necessary to complete the project.
KA ‘ULU SOLAR WATER SYSTEM
To furnish and install a new solar hot water system controller, sensors, control
wiring, and associated components, including all labor, materials, equipment, and
testing necessary to restore the existing solar hot water system for Ka Ulu Building
to full operational condition. The Contractor shall remove and dispose of the
existing non-functioning solar controller, roof-mounted sensor, tank sensor, control
wiring, and all associated components.
All electrical connections shall be completed in accordance with
the manufacturer\\\'s recommendations and applicable codes. Upon
completion of the installation, the Contractor shall perform
complete operational testing and make any necessary adjustments to
verify proper functionality of the solar hot water system and all associated
components.
Price shall include all labor, supervision, materials, solar controller, sensors,
control wiring, manual timer control boxes, removal and disposal of existing
equipment, equipment rental, tools, transportation, shipping and handling, travel
expenses, testing, system commissioning, cleanup, and all applicable taxes and
fees necessary to complete the project.
KA ‘ULU SOLAR WATER SYSTEM
To remove one (1) existing thermostatic mixing valve and modify the domestic hot
water piping system, including all labor, materials, equipment, and testing
necessary to restore proper hot water distribution throughout the building. The
existing system is equipped with two (2) mixing valves, which currently limit the
hot water temperature to approximately 98 degrees Fahrenheit and restrict adequate
hot water delivery to the new building.
All work shall be completed in accordance with applicable plumbing codes and
industry standards.
Upon completion of the installation, the Contractor shall restore water service,
perform operational testing to verify proper hot water circulation and system
performance, and restore the work area to a clean and safe condition. Price shall
include all labor, supervision, materials, copper piping and fittings, removal
and disposal of the existing mixing valve, equipment, tools, transportation,
testing, cleanup, and all applicable taxes and fees necessary to complete the
project.
LIBRARY BUILDING
To excavate and repair up to ten (10) linear feet of the existing 4-inch sanitary
sewer main exiting the Library, including all labor, materials, equipment, and
testing necessary to restore the sewer system to proper working condition.
Upon completion of the repair, the Contractor shall backfill and compact the
excavation, restore the work area to a clean and safe condition, and dispose
of all removed materials and debris. Price shall include all labor, supervision,
materials, piping, fittings, cleanout assembly, excavation, backfill, equipment,
tools, transportation, testing, cleanup, and all applicable taxes and fees
necessary to complete the project.
LIBRARY BUILDING
The Contractor shall provide all labor, materials, tools, and equipment
necessary to repair the Library Building downstairs sink plumbing.
Plumbing system shall be tested to verify proper operation and ensure there are
no leaks upon completion.
IMPORTANT NOTES:
▪︎ Work may involve temporary shutdown of campuswide water service.
▪︎ Work disrupting campus water service may be done after hours.
▪︎ All other work to be done during normal campus hours: Monday - Friday
from 7:00 a.m. - 3:30 p.m. Hawaii Standard Time (HST).
▪︎ Must be completed, tested, and certified operational within 90 consecutive
calendar days from the date designated in the approved Purchase Order.
▪︎ Vendor must properly dispose of project waste off UHMC campus property.
Special Instructions
1. All vendors are advised to review the Special Instructions and all attachments to
this Request for Quotation. Submission of a quote confirms that the vendor has carefully
examined these documents, and agrees to the University of Hawaii Terms & Conditions
applicable to all Purchase Orders.
ATTACHMENTS:
(1) Technical Specifications
(2) Requirements for Chapter 104 HRS (Wages and Hours) *PREVAILING WAGE MUST BE
PAID WHILE ON THIS PROJECT.*
(3) Special Provisions
(4) University of Hawaii Terms & Conditions Applicable to all Purchase Orders
(5) University of Hawaii General Provisions for Construction Request for Quotations
(6) Attachment C Bid Bonds/Performance Bonds
(7) Listing of Joint Contractor and/or Subcontractors
(8) Certification of Compliance with HRS 396-18, Safety and Health Programs
(9) Itemized Quote (Sample)
2. QUOTE VALID FOR: Minimum of sixty (60) consecutive calendar days after the Request
for Quotation closing date.
3. BASIS FOR AWARD: Award will be based on the total aggregate amount. Award is
subject to availability of funds.
4. REQUIRED DOCUMENTATION FOR AWARD: Vendor receiving the award is required to
provide the following documentation before purchase order is issued:
(1) Hawaii Compliance Express Certificate of Vendor Compliance
(2) Certification of Insurance (refer to Special Provisions Attachment 2)
(3) Contractor Licenses Required: C37
(4) Itemization of quote: upon request
(5) Attachment C Bid Bonds/Performance Bonds (as applicable)
(6) Listing of Joint Contractor and/or Subcontractors
(7) Certification of Compliance with HRS 396-18, Safety and Health Programs (as
applicable)
(8) Signed Super Quote Award notice
5. QUESTIONS & REQUESTS FOR SUBSTITUTION: shall be submitted via email to Herman
Andaya, email handaya@hawaii.edu no later than 12:00 p.m. Hawaii Standard Time (HST),
July 15, 2026.
6. SITE VISIT HIGHLY RECOMMENDED: A site visit will be held on July 14, 2026.
Please meet Herman Andaya at the Operations & Maintenance Building at 9:00 a.m. The
initial inspection is to identify and examine the conditions and to be aware or
satisfied as to the character and amount of work to be performed as called for by
the specifications. No additional allowance will be granted because of lack of knowledge
of such conditions.
7. Project shall be completed within 90 consecutive calendar days from the date
designated in the approved Purchase Order.
8. Inclusion of terms and conditions may be grounds for disqualification.
9. WARRANTY: The material furnished shall be new in accordance with the technical
specifications. Used or refurbished goods will not be accepted. Contractor shall
warrant that all goods furnished under this contract shall be guaranteed for the
Manufacturer\'s Standard Warranty from the date of installation. Contractor shall
replace and/or repair any defective goods at no cost to the University during the
warranty period, provided such defects are not due to abuse or negligence on the
part of the University.
10. Quote shall include all labor, materials, tools, equipment, shipping and handling,
transportation, freight, travel expenses and applicable taxes and fees necessary to
complete the project in accordance with the project description and attached documents.