Bid Date: 2026-06-17
Project Description:
The scope of work for this project addresses the upper soil on the exposed cut slope for the slope near Halona Blowhole lookout. The upper saprolite (soft rock that weathered in-place into a material similar to a clayey silt) has degraded. Repair sites based on details of attached files.
1) Methods will be evaluated and selected base on the best interest for the state.
2) The contractor shall provide the materials and tools and shall be available to begin work immediately.
3) All work shall be in accordance with the State of Hawaii 2005 Standard Specifications for Road and Bridge Construction and Special Provisions (if available) prepared for this project.
4) Contractor shall field verify all existing conditions prior to bid. Notify Engineer if any discrepancies are found.
5) Contractor is responsible for all traffic control including traffic control plans, safety devices, and equipment required.
6) Contractor shall provide necessary best management practices (BMP) for storm water pollution including permits and devices. Contractors shall prevent any debris/dust from entering streams/waters.
7) No concrete/metal can be left on site, maintain/secure work site.
8)Contractor must dispose of all debris at an authorized federal, state, and/or city location.
9) Contractor must be highly skilled in this type of repair with proof of and in good standing.
10) Work may be performed only between the hours of 8:30 am and 2:30 pm, Monday through Friday, except State Holidays, unless otherwise approved in writing by the District Engineer.
11) Contractor shall have Type “A” license.
12) If a contractor is using a subcontractor, subcontractor’s name must be provided with the bid.
Cancellation: This solicitation may be cancelled and any or all bids rejected in whole or in part, without liability to the State, when it is determined to be in the best interest of the State.
Bid price must be the total price including taxes, permits, BMP, etc.
Bond Requirements: All bidders shall be required to include a Performance Bond and a Payment Bond in accordance with HRS §103D-324 upon award of the contract. These bonds must be equal to 100% of the contract price.