Bid Date: 2026-06-12

Project Description:
The Contractor shall provide all labor, tools, equipment, and materials to perform all work related to the surface preparation of the existing Vinyl Composite Tile (VCT) in Building 306A Room 228, install new overlayed 9-inch x 60-inch Luxury Vinyl Flooring (LVT) tile, and install new 4-inch cove base.

Amendment
06/04/2026
UPDATE: Pre-Conference meeting date is June 4, 2026 at 9:00am. Please park in the visitor\'s parking lot and I will meet contractors at the guard shack.

Plans

Drawing 1 B306A 2nd Floor Drawing Scale and Marked.pdf

Drawing 2 B306A 2nd Floor Drawing Scale and Unmarked.pdf

Drawing 3 B306A 2nd Floor Drawing.pdf

Specifications

1 SOW HIENG Office Flooring Replacement.pdf
2a Photo Description HIENG Office Flooring Replacement.pdf
4 Special Provisions Const ACT 52 and 68 Rev.pdf
5 General Conditions Table of Contents.pdf
5a General Conditions.pdf
6 HIePRO Construction Offer Form.pdf

Addendums/Amendments
Amendment 1 SOW HIENG Office Flooring Replacement.pdf