Bid Date: 2026-06-11

Project Description: Replace missing metal roofing soffit at overhang near Gate 13 to match existing. Work includes the inspection of existing soffits and overhang flashing between Gates 1 to 39 to prevent future damage.

Plans

Specifications

SCOPE OF WORK . OGG Soffit Repairs at Gate 13 CM1656.33.pdf
LOCATION PLAN . OGG Replace Soffit at Gate 13 CM1656.33.pdf
PROPOSAL . OGG Soffit Repairs at Gate 13 CM1656.33.pdf
AG-008 103D General Conditions (1.10.23).pdf

Addendums/Amendments