Bid Date: 2026-06-09

Project Description: Proposed Scope of Work consists of, but not limited to: The removal of 3-inches of existing AC pavement in the parking lot area of B90. The Contractor shall repair any defects in the base course with similar base course material. Should additional base course material need to be added, the Contractor shall scarify the surface of the base course up to a maximum depth fo 2-inches. The Contractor shall then apply a 3-inch thick topcoat of Hot Mix Asphalt (HMA) State Mix V to the base course and roll. Compaction of 91% shall be monitored by the Contractor's 3rd party testing agent throughout the spreading and rolling of the HMA. All work must be performed with minimal disruption to surrounding operations and in compliance with safety and environmental regulations.

Plans

Specifications

Solicitation Packet CA202615C.pdf

Addendums/Amendments