Bid Date: 2026-05-28

Project Description:
(Qty 29) Annual Inspection, testing, maintenance and certification of UH Manoa campus installed automatic wet fire sprinkler systems.

1 AGRICULTURAL SCIENCE
2 ATHLETIC COMPLEX (IT RM)
3 BILGER HALL (Chemical Stock Room)
4 BIO MEDICAL
5 CASTLE MEMORIAL
6 CMORE HALL
7 EDMONSON HALL
8 ENVIRONMENTAL PROTECTION FACILITY
9 FPMO SHOPS
10 FPMO TRUCKING
11 GARTLEY HALL
12 HAMILTON LIBRARY (PHASE III)
13 HOLMES HALL
14 ITC BUILDING
15 KENNEDY THEATER
16 KRAUSS HALL ANNEX
17 KUYKENDALL HALL
18 LIFE SCIENCE BUILDING
19 MOORE HALL
20 MULTI-PURPOSE BLDG (UH LAB SCHL)
21 PARADISE PALMS
22 POPE LAB (STORAGE RM)
23 POST BULDING
24 SHILDER SCHOOL OF BUSINESS
25 SPALDING HALL
26 STAN SHERIFF CENTER
27 STUDENT SERVICES (QLCSS)
28 TC CHING COMPLEX
29 WARRIOR RECREATION CENTER
(Refer to attachment 1,2,3 and A) for further details.

(Qty 3) Annual Inspection, testing, maintenance and certification of UH Manoa campus installed fire pumps for buildings :
Reference Attachment #2:
#14 ITC BUILDING
#23 POST BUILDING
#26 STAN SHERIFF CENTER
See all attachments for further details (1,2,3 and A)

(Qty 5) Annual Inspection, testing, maintenance and certification of UH Manoa campus Post Indicator Valves (PIV).
Reference Attachment #2:
#5 CASTLE MEMORIAL
#15 KENNEDY THEATER
#19 MOORE HALL
#25 SPALDING HALL
#27 STUDENT SERVICES BUILDING (QLCSS)
See all attachments for further details (1,2,3 and A)

Special Instructions
Inspection, Testing and Maintenance (ITM) and certification of UH Manoa campus Fire Sprinkler Systems (29 total), Fire pumps (3 total) and Post Indicator Valves (5 total)

Work shall be completed 3 weeks ARO.

Contact the UH Fire safety program at (808) 956-4954. POC is Marvin Sagayaga (808) 956-8320 or R. Mike Merrell to schedule a site visit.

**Site visit is required prior to submittal of bid.

Honolulu Fire Department Prevention Bureau file numbers MUST accompany each riser/all inspections.

Please Note:

1) ITEM# 4 (work experience and references) of Attachment #1 MUST be submitted with bid package by closing date.

2) Attachment 1A MUST be submitted with bid package by closing date.

See attachments 1, 2, 3 and A (Four total) for details.

Plans

Specifications

Attachment #1_SPRKLR 2026 Scope of Work R05.19.26.pdf
Attachment #2_2026 Sprnklr Bldg List R62022.pdf
Attachment #3_2026 Flushing Procedures R62015.pdf
Attachment A_2026 Insurance R72012.pdf

Addendums/Amendments