Bid Date: 2026-06-23

Project Description: The scope of work generally consists of the following: purchasing, delivery, and installation of a new portable comfort station with integrated PV-battery system and an inverter generator, minimum 2000W, or enough to run and charge the batteries and power the comfort station in case of extended overcast days. Install and connect all required utilities to the new comfort station, as noted on plans and specifications herein. Connect new 6-inch sewer line to existing sewer lateral and extend along Wharf Street as shown in the plans. Lower the existing 8-inch waterline to provide 12-inch vertical clearance from new sewer line. Relocate ice maker and water ionizer items that are currently located within the existing maintenance building and install in the new maintenance building, as shown in the project plans. Coordination with Young Brothers and Maui District is required. Repair all concrete and AC pavement that is disturbed during construction.

Plans

Plans-FINAL PLANS P30251.pdf

Specifications

Specifications-FINAL SPECIFICATIONS w NTB P30251.pdf

Addendums/Amendments