Bid Date: 2026-06-08

Project Description: Provide all labor, parts, and equipment to investigate, remove and replace one (1) 3” fire sprinkler riser at Harano Tunnels, H-3 including all associated piping, fittings, valves, and accessories.

Plans

CATHODIC PROTECTION AS BUILT DRAWINGS.pdf

FIRE SPRINKLER RISER AS BUILT DRAWING.pdf

H3 MECHANICAL AS BUILT DRAWINGS.pdf

Specifications

SCOPE OF WORK H3 FIRE SPRINKLER RISER.pdf
HAIKU FIRE SPRINKLER RISER PHOTOS.pdf
AG-008 103D General Conditions (1.10.23).pdf

Addendums/Amendments