Project Description: The work generally consists of closure of the existing cesspool and the construction of a low pressure sewer system inclusive of a grinder pump and all the appurtenances.
C00BO91C AFRC Annex Fac Imp Ph 1B Sewer Imp_Plans.pdf
Specifications> C00BO91C AFRC Annex Fac Imp Ph 1B Sewer Imp_Specifications.pdf DLNR Interim General Conditions Oct 1994.pdf AG-008 103D General Conditions (1.10.23).pdf
C00BO91C AFRC Annex Fac Imp Ph 1B Sewer Imp_Specifications.pdf DLNR Interim General Conditions Oct 1994.pdf AG-008 103D General Conditions (1.10.23).pdf
B26002589 C00BO91B Anuenue FRC Fac Imp 1B Sewer Imp_Addendum No. 1_Part 2.pdf
B26002589 C00BO91B Anuenue FRC Fac Imp 1B Sewer Imp_Addendum No. 1_Part 3.pdf
B26002589 C00BO91B Anuenue FRC Fac Imp 1B Sewer Imp_Addendum No. 1_Part 4.pdf