Bid Date: 2026-05-21

Project Description: Replacement of the AC power supply in the Test, Measurement, and Diagnostic Equipment (TMDE) repair shop is critical in maintaining operational readiness. The new unit will provide stable, accurate voltage and reliable calibration, providing optimum reliability to electronic equipment maintained by this facility, and prevent errors caused by power fluctuations.

Plans

Specifications

AC Power Supply Installation -CSMS1 Power Supply Electronic Shop.pdf
AG-008 103D General Conditions (1.10.23).pdf

Addendums/Amendments