Bid Date: 2026-05-27

Project Description: The work to be performed under this contract shall consist of installation of the 12-inch Primus Liner system inside a 16-inch HDPE potable mainline that is a transmission line from the Hanapēpē Water System to the Eleele Water System. The connection point at the bottom will be where the 12-inch main exits the Eleele Booster Pump building. The 12-inch spool piece will be shortened to make room for a 12-inch mechanical flange adapter to connect the 12-inch slip line. The connection point at the top will be between the highway and the fence line for the Eleele Steel Tanks. A pit will be dug to access the 12-inch main where a mechanical flange adapter will be installed to connect the 12-inch slip line. The slip line shall be pulled through several bends along the total length of 1,000 feet of pipe run. The bottom section of 12-inch pipe to the Booster Pump building has three (3) 45° elbows, two (2) 22-1/2° elbows, and one (1) 90° elbow. The top section of pipe to the Tank site has one (1) 16-inch 90° elbow. There is no need for a bypass line for this project.

Plans

16-inch_HDPE_Install_Plans.pdf

Specifications

Hanapepe12-inchPrimusDocs.pdf
IFB_Job26-01_2ndSolicitation-FINAL-Posted-042426.pdf
IFB_Job26-01_AppendixA-SampleContract.pdf
IFB_Job26-01_AppendixB-GPCC.pdf
IFB_Job26-01_AppendixD-InsuranceRequirements.pdf
IFB_Job26-01_Slip_Line_Project_Location_Map.pdf
Job26-01_2ndSolicitation-Offer_Form.pdf
WRS510.pdf

Addendums/Amendments
IFB_Job26-01_Addendum2-Posted-051826.pdf

IFB_Job26-01_Addendum1-Posted-050426.pdf