Bid Date: 2026-05-26

Project Description:
PROVIDE ALL LABOR AND MATERIALS FOR A NEW AND PROPER LIGHTING SYSTEM AT ITC; ALL WORKS SHALL COMFORM WITH THE LATEST ADOPTED NEC.

Special Instructions
QUOTE SHALL BE VALID OF MINIMUM 90 CALENDAR DAYS.

SITE WALK THROUGH - 4/28, AT 9AM IN THE ITC LOBBY AREA (FOR ISSUEING BADGES TO ENTER). SUBSTITUTION REQUESTION - 5/5.
BID CLOSE DATE - 5/26.
PROPOSED CONSTRUCTION DATES - 7/14 - 8/7 or 12/15 - 1/8.

SCOPE OF WORK:
1. REPLACE EXISTING EXTERIOR LIGHT FIXTURES AND LIGHTING CONTROLS IN ROOMS 105A & B, AND 311 AS SPECIFIED PER THE ATTACHMENTS. CONTRACTOR MUST WORK WITH LOCAL LIGHTING/MANUFACTURE REPRESENTATIVE FOR WARRANTY ASSURANCE.

2. CONTRACTOR TO REMOVE AND DISPOSE OF EXISTING FIXTURES AND LIGHTING CONTROLS.

3. CONTRACTOR TO PROVIDE PO NUMBER, LAMP MODEL AND QUANTITY ON THE INVOICE.

4. BOND IS ONLY REQURED PER ATTACHMENT C AND IS ONLY FOR THE LOW BIDDER AFTER AWARDING THE PROJECT (NOT REQUIRED DURING BID).

5. PLEASE INCLUDE CEILING TILE REPLACEMENT PER ATTACHED AS REQUIRED. PAINT EXPOSED JBS, RACEWAYS, AND/OR UNFINISHED SURFACES TO ADJACENT PAINT FINISH.

Plans

1st Floor Light Plan.pdf

3rd floor Light Plan.pdf

Specifications

UH IT Building Conference Centers Lighting and Control Upgrade (1).pdf
09510_Acoustical_Ceiling_Biobased_Rapidly_Renewable_Products_&_Manu_04.pdf
ATTACHMENT A - Insurance REV 10-12.pdf
ATTACHMENT C.pdf
Attachment to RFQ.pdf
OPRPM FORM 54 - Subcontractor List (RFQ)-DL10102025.pdf
Substitution Request Form.pdf

Addendums/Amendments