Bid Date: 2026-03-27

Project Description: The project is for the re-construction of Kapalama Stream Channel walls at Kouhou Street and 1325 N. School Street. At Kouhou Street, a seventy-seven (77) foot section of CRM channel wall is leaning and will be demolished and re-constructed. At 1325 N. School Street a forty-one (41) foot section of CRM wall was washed away during a storm and has been replaced with a temporary CLSM wall. The temporary CLSM wall will be removed and replaced with CRM wall. Both sites have temporary wall bracing which will be removed as a part of the CRM wall construction. Work will include removal and replacement of chain-link fence and restoration of channel bank above the channel CRM wall with grassing and maintenance.

Plans

RFB-DDC-1975702_DRAWINGS.pdf

Specifications

RFB-DDC-1975702.pdf
RPT_23-0046_Kapalama Canal_Permanent_01-04-2024.pdf
SWPPP ATTACHMENT A.pdf
SWPPPTemplate-Kapalama Channel Work Areas 1 and 2.pdf
Notice to Offerors.PDF

Addendums/Amendments
Addendum No. 3.PDF

Addendum No. 2.PDF

Addendum No. 1.PDF