Bid Date: 2026-01-30
Project Description:
SCOPE OF WORK:
Contractor shall restore bridge\'s load path by lifting bridge and installing bearing pads per plan. See plans attached for details and jacking sequence.
BID INSTRUCTIONS:
Contractor shall read bidding instructions prior to bid. Failure to follow these instructions may result in rejection of the bid. State reserves the right to remove Line Item No. 2 to reduce the total bid cost. If Line Item No. 2 is removed, the State will provide the development of traffic control plans and implementation of traffic control.
1. Use Line Item No. 1 to bid for all repair work costs, excluding the costs for development of traffic control plans and implementation of traffic control. Associated costs shall include, but are not limited to, repair materials, equipment, tools, permits, BMPs, all applicable taxes, and incidental work.
2. Use Line Item No. 2 to bid solely for the development of traffic control plans and implementation of traffic control. Associated costs shall include, but are not limited to the design services, labor, equipment, materials, signage, all applicable taxes and incidental work. See additional notes listed in this line item.
GENERAL NOTES:
1. Contractor shall provide necessary Best Management Practices (BMPs) to prevent any debris from falling into the stream.
2. All materials and workmanship shall conform to the State of Hawaii 2005 Standard Specifications for Road and Bridge Construction and Special Provisions (if available) prepared for this project.
3. Contractor shall maintain and secure work site during and at the end of each work shift.
4. Contractor shall field verify all existing conditions prior to bid. Notify Engineer if any discrepancies are found.
5. Verify and check all dimensions and details shown on the drawings prior to the start of construction. Any discrepancy shall be immediately brought to the attention of the Engineer for direction.
6. Contractor shall furnish, pay for, and install all materials, tools and equipment required to complete the work, and shall be available for work immediately.
7. Contractor shall submit material samples and/or a Certificate of Compliance from the manufacturer, supplier, or both, for review and approval of the Engineer prior to construction.
8. Contractor must be licensed and highly skilled in this type of repair with proof of and in good standing.
9. A pre-construction meeting with representatives from affected Agencies, State, and the Contractor shall be held prior to commencement of construction.
10. Contractor shall possess a Type A Contractor license. Provide the name of subcontractors at the time of bid opening, to be used for this project.
Cancellation: This solicitation may be canceled, and any or all bids may be rejected in whole or in part, without liability to the State, when it is determined to be in the State’s best interest.
Bond Requirements: All bidders shall be required to include a Performance Bond and a Payment Bond in accordance with HRS §103D-324 upon award of the contract. These bonds must be equal to 100% of the contract price.