Bid Date: 2025-11-24

Project Description: The project shall in general consist of but is not limited to furnishing material, labor and equipment to remove existing construction and equipment and repair, add or replace roofing, gutters, downspouts and drainpipes, covered walkway structures, lighting and related work at buildings 386A, 387, and 388 as called for on the Plans and Technical Specifications. The work shall include but not be limited to the following:
a. Selective Demolition.
b. Miscellaneous metal fabrications.
c. Metal roofing.
d. Building Insulation.
e. Flashing and sheet metal.
f. Gutters and downspouts.
g. Sealants.
h. Painting.
i. Mechanical work.
j. Electrical work.
k. Removal and disposal of hazardous materials
l. Miscellaneous items.

Plans

05 - Plans.pdf

Specifications

01 - Bid Pages.pdf
02 - Surety Bid Bond Form.pdf
03 - Requirements of Chapter 104, HRS Wages and Hours.pdf
04 - Technical Specifications.pdf
06 - Special Provisions.pdf
07 - General Provisions.pdf
08 - FCO-008 Insurance and Tax Rate Percentage Form.docx
09 - FCO Form 96 Change Order Proposal (COP) Form 10-12-23.xlsx
10 - FCO Form 96 Change Order Proposal Guidelines 10-12-23.pdf

Addendums/Amendments