Bid Date: 2025-10-03
Project Description: Provide all labor necessary to repair the leaks on the chiller and repair the DDC
controls as indicated in the plans and specifications. The proposed work shall
generally include removal, disposal and replacement of the chillers O-ring /gaskets
per manufacturer’s specifications; any insulation that is removed must be replaced
with new. Start-up the chiller per manufacturer’s recommendations and perform system
checks to confirm proper operations. Submit all data collected to the university of
Hawaii facilities management office, attention: Carl Oshiro prior to request for
final inspection. All work located in the mechanical room at Holmes Hall, UHM.
Provide all tools, materials, equipment and insurance necessary to repair the leaks
on the chiller and repair the DDC controls as indicated in the plans and
specifications. The proposed work shall generally include removal, disposal and
replacement of the chillers O-ring /gaskets per manufacturer’s specifications; any
insulation that is removed must be replaced with new. Start-up the chiller per
manufacturer’s recommendations and perform system checks to confirm proper
operations. Submit all data collected to the university of Hawaii facilities
management office, attention: Carl Oshiro prior to request for final inspection. All
work located in the mechanical room at Holmes Hall, UHM.
.JCI Controls.
Special Instructions
ALL bidders are requested to attend a mandatory site walk-through. A site walk through is
scheduled for 8:00 a.m. on Friday September 19, 2025. Contractors shall meet at the
Physical Plant Mechanical Engineer Office located at 2002 East- West Road. Contract
documents will be distributed at the mandatory walk through. Contractors interested in
bidding this work must contact Carl Oshiro through email ( coshiro6@hawaii.edu), facsimile
(956-5979) or phone (956-0479) to confirm attendance by 4:00 p.m. Thursday September 18,
2025. Contractors who DO NOT attend a mandatory site walk-through will not be allowed to
bid on this work. Contractor is required to provide a cost breakdown at time of bid. The
breakdown must equal to the total cost of the bid. If correct breakdown is not provided at
time of bid, the bid may be disqualified.
No attachments have been added to this solicitation.
Addendum
09/26/25
Add to the bid. Provide 500 pounds new R-123