Bid Date: 2025-10-16

Project Description: The scope of work consists of pavement reconstruction within the road right-of-way. The scope of work also includes removal of existing sidewalks, installation of new raised concrete sidewalks and asphalt bike lanes, installation of new curb/gutters, removal/replacement of existing curb ramps and driveway aprons, installation of new pavement striping and markers, adjusting manholes/valves frames and covers where needed, removal/replacement of existing drainlines, waterlines and sewer lines, installation of new catch basins and drain manholes, and removal/replacement of signage and posts.

Plans

STP-3830(006) Lower Main_BID PLANS_6.25.25.pdf

Specifications

STP-3830(006) Lower Main_BID SPECS_6.25.25.pdf

Addendums/Amendments