Bid Date: 2025-10-06

Project Description: This project consists of replacing the existing fire alarm system with a new, complete fire alarm and mass notification (MNS) system at Buildings 6111, 6112, 6113, 6114, and 6115 at Marine Corps Base Hawaii. The project also includes extending the existing fire sprinkler system to Building 6706C3.

This project is Prevailing Wage and has the Buy American Requirement. The project duration is 300 days.

Trades required: Utility Locating (GPR), Temporary Office Trailer, Portable Restrooms, Construction Waste Management, Demolition, Firestopping, Drywall (Patching), Painting, Fire Sprinkler, Electrical and Fire Alarm.

BID DATE: 10/06/2025 10:00 AM Hawaiian

QUESTIONS DUE: 09/11/2025 12:00 PM HST

PRE BID: 09/09/2025 7:00 AM HST
B6112, MCBH Kaneohe Bay

Construction Type: Tenant Imporvments (Design/Bid/Build)

Construction Value: $500,000 - $1,000,000

Submit questions to Vishal Visavale at vishal@authumki.com.

Submit Proposals by 09/17/2025 via fax 480.377.1143 or email vishal@authumki.com.

Plans

Encl__3__B6112_Repl_Main_FA_System_100__Dwgs.pdf

Specifications

ACQR_6130136__RFP_SDVOSB_21R4048 (R).pdf
Encl__1__Schedule_Lump_Sum.pdf
Encl__2__B6112_Replace_Fire_Alarm_System_100__Specs.pdf

Addendums/Amendments
AM0003_25_R_AM13 Copy R.docx

Encl_3_Sprinkler_Riser.pdf

Encl_2_RFI_Answers.pdf

Encl_1_B6111_B6115_Child_Development_Center.pdf

AM0002_25_R_AM13 (R).pdf

AM0001_25_R_AM13 _ R.pdf

IMG_4578.MOV

IMG_4579.MOV

IMG_4580.MOV

IMG_4581.MOV

IMG_4582.MOV

IMG_4583.MOV

IMG_4584.MOV

IMG_4585.MOV

IMG_4586.MOV

IMG_4587.MOV

IMG_4588.MOV

IMG_4589.MOV

IMG_4590.MOV

IMG_4591.MOV

IMG_4592.MOV

IMG_4593.MOV

IMG_4594.MOV

IMG_4595.MOV

IMG_4596.MOV

IMG_4597.MOV

IMG_4598.MOV

IMG_4599.MOV

IMG_4600.MOV

IMG_4602.MOV

IMG_4618.MOV

IMG_4620.MOV

IMG_4622.MOV

IMG_4623.MOV

IMG_4624.MOV

IMG_4625.MOV

IMG_4626.MOV

IMG_4627.MOV

IMG_4628.MOV

IMG_4629.MOV

IMG_4630.MOV

IMG_4631.MOV

IMG_4632.MOV

IMG_4633.MOV

IMG_4634.MOV

IMG_4635.MOV

IMG_4636.MOV

IMG_4637.MOV

IMG_4638.MOV

IMG_4639.MOV

IMG_4640.MOV

IMG_4641.MOV

IMG_4744.MOV

IMG_4745.MOV

IMG_4750.MOV

IMG_4751.MOV

Site Pictures 1 of 4.pdf

Site Pictures 2 of 4.pdf

Site Pictures 3 of 4.pdf

Site Pictures 4 of 4.pdf

Pictures 1 of 4.pdf

Pictures 2 of 4.pdf

Pictures 3 of 4.pdf

Pictures 4 of 4.pdf

Site Visit Details.docx