Bid Date: 2025-09-19

Project Description: The scope of work consists of the replacement of 72 existing closed-circuit television (CCTV) cameras along the H-3 Freeway and within the Tetsuo Harano Tunnel, installation and replacement of the corridor wide fiber optic trunk communication cable, installation of two (2) new CCTV cameras on H-3 Freeway, operator equipment upgrades at the Tetsuo Harano Tunnel traffic operations center that includes the upgrade and provision of two (2) new workstations and replacement of the existing video switch and video wall display. Work also includes the installation of three (3) new CCTV cameras on Pali Highway (Route 61) with limited new conduit installation at the camera sites for camera connectivity to existing fiber and installation of a fiber optic conduit between Kalihi Interchange and Houghtailing Street on the H-1 Freeway.

Plans

FINAL PLANS NH 0300 176.pdf

Specifications

FINAL SPECIFICATIONS w NTB NH 0300 176.pdf

Addendums/Amendments