Bid Date: 2025-09-09

Project Description: The scope of work generally consists of constructing rockfall mitigation measures to prevent property damage and personal injury. A slope stabilization system made from steel wire mesh shall be draped over the slope face and secured by steel cables.

Plans

Plans-FINAL PLANS P70151.pdf

Specifications

Specifications-FINAL SPECIFICATIONS w NTB P70151.pdf

Addendums/Amendments