Bid Date: 2025-07-03

Project Description: The General Scope of Work is as follows: Replacement of existing restroom fixtures within 2 buildings including Keller Hall and Physical Science Building. There are a total of 25 restrooms (men's, women's, & all gender). Renovation plans include all new flooring, wall covering, plumbing fixtures, toilet partitions, toilet accessories, door louvers, doors and frames, concrete, metal framing, ceramic tile, fluid applied waterproofing, electrical, painting, guardrail/handrail, plumbing lines, and miscellaneous work. Certain sections of the ceiling in specified buildings are being renovated. All ceilings will be painted in its entirety. Installed water closets, urinals, and faucets will be new low-flow type and have sensor actuators. Hazardous material abatement including asbestos, lead, PCB/Mercury and Chlordane contaminated soils.

Replacement of existing exposed exhaust ductwork within the workspaces (bathrooms, janitor closets, and ante rooms) that show damages (holes, corrosion, etc) and as indicated on plans. The existing exhaust ductwork in the Physical Science Building shows missing exhaust registers. A new exhaust register is to be provided and installed. Ductwork to be modified as required.

Plans

05 - Plans.pdf

Specifications

01 - Bid Form.pdf
02 - Surety Bid Bond Form.pdf
03 - Requirements of Chapter 104, HRS Wages and Hours.pdf
04 - Technical Specifications Part 1 of 2.pdf
04 - Technical Specifications_Part 2 of 2.pdf
06 - Special Provisions.pdf
07 - General Provisions.pdf
08 - FCO-008 Insurance and Tax Rate Percentage Form.docx
09 - FCO Form 96 Change Order Proposal (COP) Form 10-12-23.xlsx
10 - FCO Form 96 Change Order Proposal Guidelines 10-12-23.pdf

Addendums/Amendments