Bid Date: 2025-07-03
Project Description: The General Scope of Work is as follows: Replacement of existing restroom fixtures within 2 buildings including Keller Hall and Physical Science Building. There are a total of 25 restrooms (men's, women's, & all gender). Renovation plans include all new flooring, wall covering, plumbing fixtures, toilet partitions, toilet accessories, door louvers, doors and frames, concrete, metal framing, ceramic tile, fluid applied waterproofing, electrical, painting, guardrail/handrail, plumbing lines, and miscellaneous work. Certain sections of the ceiling in specified buildings are being renovated. All ceilings will be painted in its entirety. Installed water closets, urinals, and faucets will be new low-flow type and have sensor actuators. Hazardous material abatement including asbestos, lead, PCB/Mercury and Chlordane contaminated soils.
Replacement of existing exposed exhaust ductwork within the workspaces (bathrooms, janitor closets, and ante rooms) that show damages (holes, corrosion, etc) and as indicated on plans. The existing exhaust ductwork in the Physical Science Building shows missing exhaust registers. A new exhaust register is to be provided and installed. Ductwork to be modified as required.