Bid Date: 2025-04-30

Project Description:
One (1) each NEW Compact Horizontal Chipper/Shredder to process wood waste, yard debris, and other organic materials into smaller pieces/mulch, Bandit Mini Beast Model 1425 or approved substitution.

MINIMUM REQUIREMENTS:
(1) Capacity: 10 (min) - 14 (max) inch capacity
(2) Mill opening: Approx. 20 in. high x 25 in. wide
(3) Feed Wheel: Approx. 15-3/4 in. diameter x 25 in. wide chain driven top feed wheel
(4) Infeed Conveyor: Single speed, approx. 7 ft long x 24 in wide hydraulically driven (2-ply / 400 lb) rubber infeed conveyor with adjustable steel front extension pan
(5) Discharge Conveyor: approx. 18 in. wide cleated rubber with 7 feet stacking height
(6) Emergency conveyor/engine shutoff detent push pads
(7) Towable with Pintle Ring
(8) Trailer Jack Stand
(9) Engine: Diesel Tier 4 compliant engine
(10) Control System and Engine Installation: Cat 120 horsepower installation with Bandit enclosure
(11) Approx. 10,000 lb capacity hand crank tongue jack with spring pad return
(12) Dust control curtain on feedbox
(13) 3 speed proportional feed system
(14) 2 side shut down switches along with pull cables for machine shut down
(15) Push button key pad controls (yoke up/down, feed forward/reverse, discharge on/off)
(16) Clutch: Over center manual clutch
(17) Fuel Tank: 40 gallons
(18) Hydraulic Tank: 40-45 gallons
(19) Remote mounted hydraulic cooler with electric fan
(20) 10 lb. ABC Type Fire Extinguisher with mount
(21) Magnetic head pulley and steel collector pan
(22) Axle: Single approx. 12,000 lb Leaf spring electric brake axle with (2) 235/75R approx. 17.5 in. tires
(23) Fender: 12 in. aluminum bolt-on single axle fenders with mud flaps
(24) Beast Cutterbody: Cuttermill with raker style cutterbodies (includes rakes and bolts) to be installed on machine (include 7 extra cutterbodies)
(25) Beast Teeth/Knife: Double blunt nose splitter tooth and Double short shingle tooth to be installed on machine
(26) Screen: Approx. 1/2 in. thick, 3 in. modified diamond screen
(27) Bolt on infeed flare - radiator side
(28) Colorant manifold only (does not include coloring system)
(29) Standard Warranty
(30) Parts & Operations Manuals

Training and Familiarization of Equipment

Special Instructions
1. All vendors shall review the attached documents before submitting a quotation.

Attachment 1: Special Provisions
Attachment 2: University of Hawaii Terms and Conditions Applicable to All Purchase Orders

2. Hawaii Compliance Express: Quotes of $2,500 or more will require a Certificate of Vendor Compliance in compliant status at time of award (HRS 103D-310(c). If a vendor does not have a compliant certificate, the vendor\'s quote will be disqualified, and the next lowest quote will be considered. For more information, refer to: https://vendors.ehawaii.gov/hce/

3. If submitting a quote for a product substitute, advance approval is required. The University may reject or deny any product offer that it deems to not be equivalent, and the findings in this regard shall be final and binding.

Question & Requests for Substitution shall be submitted to Melvin Hipolito, Jr., email: mh2350@hawaii.edu by 2:00 pm Hawaii Standard Time (HST), April 23, 2025.

4. Quote must be valid for a minimum of 90 days after the Request for Quotation closing date.

5. Award will be in aggregate and subject to availability of funds.

6. Price shall be F.O.B. Destination, including all applicable charges, shipping, and taxes to:
University of Hawaii Maui College
Operations & Maintenance Department, Bldg 2235
310 W. Kaahumanu Avenue
Kahului, HI 96732

7. Delivery is required within 180 consecutive calendar days after receipt of order (ARO).

8. Vendor receiving the award is required to provide the following documentation before a purchase order is issued. Note: Do not make any purchase until the approved purchase order is provided.
(1) Hawaii Compliance Express Certificate of Vendor Compliance
(2) Certificate of Liability Insurance (refer to Special Provisions Attachment 1)
(3) Signed Superquote Award notice

8. Upon request, the following documents shall be provided to the University:
(a) Manufacturer literature or brochure with technical data and illustrations of the product being offered.
(b) Warranty information for the proposed unit.

Plans

Specifications

Attachment 1 Special Provisions Chipper Shredder.pdf
UH Purchase Order Terms.pdf

Addendums/Amendments