Bid Date: 2025-05-14

Project Description: Contractor shall furnish all labor, tools, materials, and equipment necessary to complete the following scope of work:
a. Conduct site investigation to obtain field measurements at Aina Koa Booster 4 and Aina Koa Booster 5.
b. Remove existing Aina Koa Booster 4 and Aina Koa Booster 5 motor controller switchboard main circuit breaker.
c. Provide and install new main circuit breaker at Aina Koa Booster 4 and Aina Koa Booster 5.
d. Perform testing of circuit breaker installations.
e. Conduct arc flash hazard analysis and short circuit/coordination study of the circuit breakers with the existing electrical distribution system.

Plans

Specifications

JOB 25-037 SPECIFICATIONS.pdf
JOB 25-037 BID SUPPORTING DOCUMENTS.pdf
JOB 25-037 PREBID INFO.pdf
JOB 25-037 BID PROPOSAL EXCEL FILE.xls
JOB 25-037 SPO SQQ.pdf
Digital and Electronic Signature Info 4-14-22.pdf

Addendums/Amendments