Bid Date: 2025-05-21

Project Description: The Contractor shall provide all labor, tools, equipment, and materials to perform all work related to AC repaving at the project location: (see Attachment 2).
1. Remove all existing AC in the marked off location.
2. Repair base course by filling in low spots. Re-compact the entire location. Grade base course surface to allow for proper drainage.
3. Place a minimum 3-inch layer of hot mix asphalt (HMA) and compact.

The Contractor is responsible for the re-installation and proper function of in-road sensors for the barrier gates. These sensors must be fully functioning and properly installed by the time of completion of the project.

Amendment/Addendum
04/17/2025
Incorrect description in attachment 6

Plans

Specifications

1 SOW.pdf
2 Description and Photos.pdf
3 Special Notice to Bidders Rev.pdf
4 Special Provisions Const ACT 52 and 68 Rev.pdf
5 General Conditions Table of Contents.pdf
5a General Conditions.pdf
6 HIePRO Construction Offer Form.pdf
AG-008 103D General Conditions (1.10.23).pdf

Addendums/Amendments
6 HIePRO Construction Offer Form.pdf