Bid Date: 2025-04-03

Project Description: Permanent structural BMPs shall be installed in two locations along Akiohala Street in Kailua. The project includes, but is not limited to: demolition of miscellaneous right-of-way features, installation of a vegetated bioinfiltration curb extension with an underdrain system and an adjacent bike lane, installation of a stormwater treatment device and associated diversion weir structures on existing storm drains, testing and commissioning of all BMPs, miscellaneous restoration work, traffic control measures, and post-construction monitoring and maintenance. The Contractor must provide all labor, materials and equipment needed to meet the minimum specifications herein.

Plans

Kaelepulu MS4 Storm Water BMPS Signed Plans_Part 1.pdf

Kaelepulu MS4 Storm Water BMPS Signed Plans_Part 2.pdf

Specifications

2020 C&C Public Works Construction Standard Specifications.pdf
2020 C&C Public Works Construction Standard and Typical Details.pdf
Kaelepulu Special Provisions Combined.pdf
Notice to Offerors.pdf

Addendums/Amendments
RFB-DFM-1880406 Addendum No. 2.pdf

RFB-DFM-1880406 Addendum No. 1.pdf