Bid Date: 2025-01-24

Project Description: This contract consists of furnishing all materials, labor, tools, and equipment for the installation of the Project, as indicated in the contract drawings and specifications. The Project includes the installation of 6-, 16-, and 18-inch diameter ductile iron water pipe and appurtenances; installation of 2-inch diameter Schedule 80 PVC water pipe, trench excavation; connections to existing waterlines; temporary waterline and temporary service connections; demolition and removal of existing waterlines and appurtenances; replacement of existing service laterals, including water meters and meter boxes; and pavement restoration.

Plans

IFB_Job18-03_Kuhio_Highway_Hardy-Oxford_Plans-Signed.pdf

Specifications

IFB_Job18-03_Appendix_J-Phase_I_ESA.pdf
IFB_Job18-03_Appendix_I-Archaeological_Literature_Review_and_Field_Inspection_Report.pdf
IFB_Job18-03_Appendix_D-Insurance.pdf
IFB_Job18-03_Appendix_C-Offer_Form.pdf
IFB_Job18-03_Appendix_B-GPCC.pdf
IFB_Job18-03_Appendix_A-Sample_Contract.pdf
WRS507.pdf
IFB_Job18-03_Solicitation-Final.pdf

Addendums/Amendments
IFB_Job18-03_Addendum1-Posted-112024.pdf