Bid Date: 2024-12-10

Project Description: The scope of work consists of constructing new concrete curb and gutter, and sidewalk on the south side of Kaahumanu Avenue between Mile Post (M.P.) 0.92 and M.P. 1.11. The Project also includes replacing and upgrading existing guardrails and end treatments to meet current standards and installing 1-1/2 Inch Hot Mix Asphalt (HMA) pavement (Mix No. IV), at guardrail front, under, behind, and beyond end terminals.

Plans

FINAL PLANS NH 032 1 011.pdf

Specifications

FINAL SPECIFICATIONS w NTB NH 032 1 011.pdf

Addendums/Amendments
FINAL ADDENDUM NO 1 NH 032 1 011.pdf