Bid Date: 2024-12-20

Project Description: The scope of work consists of widening portions of the paved shoulders; reconstructing and resurfacing portions of the paved travel lanes and shoulders; grading and paving roadway shoulders; installing, replacing, and adjusting guardrails; paving underneath guardrails; performing maintenance of drainage culverts; installing and replacing signage and pavement markings; grading a parking area with gravel; realigning an existing irrigation ditch; stabilizing the roadside embankment constructing temporary staging areas; installing temporary Best Management Practices and erosion control measures.

Plans

FINAL PLANS STP 0550 006_Part2.pdf

FINAL PLANS STP 0550 006_Part1.pdf

Specifications

STP 0550 006 R10H372.FNL.24.signed.pdf
STP 0550 006 2024RenewalNGPC.pdf
STP 0550 006 24 NR VN 28 DO part 1 signed.pdf
FINAL SPECIFICATIONS W NTB STP 0550 006.pdf

Addendums/Amendments
FINAL ADDENDUM NO 2 STP 0550 006.pdf

FINAL ADDENDUM NO 1 STP 0550 006_Part2.pdf

FINAL ADDENDUM NO 1 STP 0550 006_Part1.pdf