Bid Date: 2024-10-08

Project Description: This MACC IDIQ Task Order project will occur at Acute Care Clinic Building 30 Tripler Army Medical Center, 459 Patterson Road, Honolulu, HI 96819. The Government is soliciting to award a task order to provide complete construction services in accordance with the attached Basis of Design, Specifications, and drawings. Contractor shall furnish labor and materials and perform work to replace the roofing and insulation of the ACC along with associated demolition, roof drains and flashings. Portions of the existing concrete porte cochere will be demolished and replaced as required by drawings and specifications to include demolition of existing PV arrays. This project will be subject to the VA NCO 21 MACC, Group 2 Contract (available in our online plan room), the Buy American Act, and the Prevailing Wage Decision rates. The D Square Construction Sample Subcontract is available for review in the SUBCONTRACT DOCS folder, with the bidding documents in our online plan room. By submitting a price proposal, subcontractors acknowledge they have read our subcontract and will sign our subcontract as part of the condition of doing the work they are proposing. The Bid Schedule contains one (1) Base Bid Proposal Lump Sum Price Line. The price will remain valid to for 30 calendar days as stated in the solicitation. Trades Required: Demolition, Concrete, Concrete Reinforcement, Painting, Roofing, Insulation, Electrical, HVAC, Sheet Metal and Flashing, Plumbing, Doors, Door Hardware, Communications

Plans

P01-Drawings100pctConstructionR2240627.pdf

Specifications

D-Square 36C26120D0082 P00003.pdf
C03 - 36C26120D0082 P00002 - D-Square.pdf
C03 - 36C26120D0082 Atch C. FAR VHA Supplemental COVID 19.pdf
C03 - 36C26120D0082 Atch B. FAR 52.222-55 Minimum Wages for Contractor Workers.pdf
C03 - 36C26120D0082 Atch A. - HI - Nevada - CA.pdf
C03 - 36C26120D0082 P00001 - D-Square.pdf
Master VA Contract 36C26120D0082.pdf
D Square Sample Subcontract.pdf
C03. Attachment - 014500.docx
C03. Attachment - Sustainable Design Manual - Copy.pdf
C03. Attachment - NCO 21 CONSTRUCTION MACC ADDITIONAL TERMS AND CONDITIONS.docx
Attachment - WDs VISN 21 - Copy.pdf
WAGEDETERMINATIONCA-HI-NV5-18-24.pdf
Questions-ACCRoofReplacement.docx
PageAS102VAHIACCReroof459-21-101100pctConstructionDocsR2240828.pdf
DivisionConstructionCosts-ACCRoofReplacement.docx
36C26124R0076_1 RFP.docx
P01-SpecsACCRoofReplacementR1231129.pdf

Addendums/Amendments
36C26124R00760001.docx

SITEVISITLOG (1).pdf